Skip to main content

Trade · Framing

Sixteen on center. Sheathed to spec.

Load-bearing walls stood plumb and true. Studs at sixteen inches on center. APA-rated sheathing edge-nailed. Rafters sized to the calc, blocked at every bay, ready for the trades that follow.

Specification

Studs
2×4 · 16″ O.C.
Sheathing
7/16 OSB · APA
Roof
Cut rafters · 4:12 min
Code
CRC R602

Questions we actually get

  • When is the best time of year for framing in Fresno?

    October through April is the calm window. We schedule around forecast heat and rain, and we won't install materials outside their manufacturer temperature specs.

  • Are you licensed and insured?

    CA Lic. #1106681 · Class B, bonded to $25,000, general liability + workers' comp insurance.

Send the plans

Send the scope. We will bid the job.

Plans, drawings, or a photo of the site. We reply within two business days.