04 · Selected work · 01 — 05
A catalog. Photographs follow as jobs are delivered.
Reference imagery of the trades and material palettes we work with. Every plate is labeled — photographs of completed work are added as jobs close.

Reference
01Huntington Boulevard · Fresno · Reroof · Framing repair · Underlayment
A Spanish tile roof, refit for a hundred-degree Fresno afternoon.
1925 Spanish Colonial Revival — clay tile pulled, deck fixed, cool-rated batten and underlayment installed with our C-39 partner, tile reset.
- Roof
- 24 sq
- Pitch
- 4:12
- Underlayment
- Synthetic + I&W
- Timeline
- 12 days

Reference
02Tower District · Fresno · Tile · Flooring · Trim
A kitchen laid flat, joints centered on the light.
- Floor
- 620 sq ft
- Tile
- 12×24 porcelain
- Backsplash
- 3×12 honed marble
- Timeline
- 9 days

Reference
03Old Town Clovis · Concrete piers · Framing · Pergola
A pergola sized to the July sun, wired for the string lights.
- Footprint
- 12 × 16 ft
- Posts
- 6×6 cedar · 4 ea
- Circuits
- 1 dedicated 20A
- Timeline
- 6 days

Reference
04Madera · Site prep · Rebar · Flatwork
Rebar tied straight before the pour.
- Slab
- 720 sq ft
- Depth
- 5 in
- Rebar
- #4 @ 18″ O.C.
- Timeline
- 5 days + cure

Reference
05Visalia · Foundation · Framing · Envelope
A backyard ADU, framed straight and roofed for the code.
- Footprint
- 20 × 24 ft
- Walls
- 2×6 · R-21
- Roof
- Cool-rated comp
- Timeline
- 16 weeks