04 · Selected work · 01 — 05

A catalog. Photographs follow as jobs are delivered.

Reference imagery of the trades and material palettes we work with. Every plate is labeled — photographs of completed work are added as jobs close.

Hand-laid Spanish clay barrel and pan tiles on a warm terracotta roof, close macro
ReferenceProject No. 001 · 2026
01Mufid Majnun · Unsplash

Huntington Boulevard · Fresno · Reroof · Framing repair · Underlayment

A Spanish tile roof, refit for a hundred-degree Fresno afternoon.

1925 Spanish Colonial Revival — clay tile pulled, deck fixed, cool-rated batten and underlayment installed with our C-39 partner, tile reset.

Roof
24 sq
Pitch
4:12
Underlayment
Synthetic + I&W
Timeline
12 days
Hand setting subway tile on a fresh thinset-combed wall mid-installation
ReferenceProject No. 002 · 2026
02Charles Deluvio · Unsplash

Tower District · Fresno · Tile · Flooring · Trim

A kitchen laid flat, joints centered on the light.

Floor
620 sq ft
Tile
12×24 porcelain
Backsplash
3×12 honed marble
Timeline
9 days
Natural cedar covered patio with dining set in a Central Valley residential backyard
ReferenceProject No. 003 · 2026
03Brian Wangenheim · Unsplash

Old Town Clovis · Concrete piers · Framing · Pergola

A pergola sized to the July sun, wired for the string lights.

Footprint
12 × 16 ft
Posts
6×6 cedar · 4 ea
Circuits
1 dedicated 20A
Timeline
6 days
Crew screeding and finishing a freshly poured residential concrete slab with rebar formwork
ReferenceProject No. 004 · 2026
04Nihar Reddy Jangam · Unsplash

Madera · Site prep · Rebar · Flatwork

Rebar tied straight before the pour.

Slab
720 sq ft
Depth
5 in
Rebar
#4 @ 18″ O.C.
Timeline
5 days + cure
Central Valley Craftsman bungalow in warm afternoon sun with covered porch
ReferenceProject No. 005 · 2026
05Kyle Smith · Unsplash

Visalia · Foundation · Framing · Envelope

A backyard ADU, framed straight and roofed for the code.

Footprint
20 × 24 ft
Walls
2×6 · R-21
Roof
Cool-rated comp
Timeline
16 weeks