Trade · Concrete & Cement
Every project starts at the slab.
Site preparation, formwork, foundations, and flatwork. Mixes engineered from 3,000 to 4,000 PSI. Expansion joints sawcut on eight-to-twelve-foot centers for Central Valley temperature swing. Every pour designed to hold.
Specification
- Mix
- 3,000 – 4,000 PSI
- Joints
- Sawcut · 8–12 ft O.C.
- Install
- Oct – Apr optimal
- Code
- CBC Ch. 19
Questions we actually get
When is the best time of year for concrete & cement in Fresno?
October through April is the calm window. We schedule around forecast heat and rain, and we won't install materials outside their manufacturer temperature specs.
Are you licensed and insured?
CA Lic. #1106681 · Class B, bonded to $25,000, general liability + workers' comp insurance.
Send the plans
Send the scope. We will bid the job.
Plans, drawings, or a photo of the site. We reply within two business days.