Every project starts at the slab.

Site preparation, formwork, foundations, and flatwork. Mixes engineered from 3,000 to 4,000 PSI. Expansion joints sawcut on eight-to-twelve-foot centers for Central Valley temperature swing. Every pour designed to hold.

Specification

Mix
3,000 – 4,000 PSI
Joints
Sawcut · 8–12 ft O.C.
Install
Oct – Apr optimal
Code
CBC Ch. 19

Questions we actually get

  • When is the best time of year for concrete & cement in Fresno?

    October through April is the calm window. We schedule around forecast heat and rain, and we won't install materials outside their manufacturer temperature specs.

  • Are you licensed and insured?

    CA Lic. #1106681 · Class B, bonded to $25,000, general liability + workers' comp insurance.